Office The Bridge

Grzybowska 73, Warsaw, Wola

4.8/5 (4 ratings)

The Bridge, Grzybowska 73, Warsaw, Wola
The Bridge, Grzybowska 73, Warsaw, Wola
Quick request

We usually answer in 4 hours. We do not send spam.

Information on personal data security policy on officelist.pl. More »

About The Bridge office

The Bridge is a prestigious glass skyscraper located in the Central Business District and in the vicinity of Warsaw Spire, Daszyński Roundabout and major traffic arteries. It has 40 floors and 47,000 sqm of office space. The area of a typical floor is about 1,100 sqm. The office building is connected by a common, representative lobby with the historic and restored building of the former Bellona Publishing House. In this way, a symbolic bridge was created, which connects old architecture with new, history with modernity. The skyscraper offers attractive office space with a magnificent view of the Warsaw skyline. The high standard of finishes, the use of ergonomic and pro-ecological solutions confirmed by WELL and BREEAM certificates, the possibility of flexible interior design, modern design, as well as glazed elevations and optimal access to daylight, ensure comfortable working conditions. Tenants have at their disposal a café on the first floor, a multi-level underground parking garage, electric car chargers and locker rooms and showers for cyclists. Surrounding the building is a green urban space with fountains and elements of small architecture, complemented by a gastronomic and retail area. The Bridge is located in Warsaw's Wola district, close to the Warsaw Uprising Museum. The neighborhood of top-class office buildings, skyscrapers, banks, international companies, as well as hotels, theaters, stores, cafes and restaurants, creates an inspiring business environment. The vibrant neighborhood provides inspiration and motivation for action, and is also a place for business and social gatherings. The location allows efficient access to other parts of the city, both by public and private transportation. Numerous bus and streetcar stops are nearby, as well as the Rondo Daszyńskiego metro line II station. It takes about 7 minutes to get by car to the Warsaw Central Railway Station, about 18 minutes to Warsaw Chopin Airport.

The Bridge property features

  • Access control
  • Air conditioning
  • BMS
  • Carpeting
  • Computer cabling
  • Fibre optics
  • Green certificate
  • Power cabling
  • Raised floor
  • Smoke detectors
  • Suspended ceiling

The Bridge office lease offer

Rent space200–48,100
Rent26 /
Service charge24 PLN/m2

The Bridge property info

Total office space47,000 m2
Typical floor space1,100 m2
Completion date05.2025

These property particulars are only of information character and do not constitute offer to conclude any agreement within the meaning of provisions of Polish Civil Code (Journal of Laws from 1964, no. 16, item 93 as amended).

The Bridge location

In the immediate vicinity there are bus stops, incl. Muzeum Powstania Warszawskiego 02, Muzeum Powstania Warszawskiego 06, Muzeum Powstania Warszawskiego 05, Muzeum Powstania Warszawskiego 03, Muzeum Powstania Warszawskiego 01, Rondo Daszyńskiego 05, Rondo Daszyńskiego 07, Rondo Daszyńskiego 02, Rondo Daszyńskiego 08, Rondo Daszyńskiego 06, Okopowa 07, Rondo Daszyńskiego 03, Wronia 01, Rondo Daszyńskiego 01, Okopowa 05, Okopowa 01, Siedmiogrodzka 02, Okopowa 03, Rondo Daszyńskiego 09, Karolkowa 01, Karolkowa 03, Okopowa 02, Okopowa 04, Karolkowa 02, Okopowa 10, Karolkowa 04, Okopowa 08, Mennica 02, Siedmiogrodzka 01, Wola - Ratusz 03, Leszno 01, Chłodna 01, Wola - Ratusz 05, Chłodna 02, Leszno 02, Wola - Ratusz 06, Mennica 04, Wola - Ratusz 04, Żytnia 02, Norblin 02, Mennica 03, Wola - Ratusz 01, Wola - Ratusz 02, Żytnia 01, Pl. Zawiszy 14, Pl. Zawiszy 13, Zajezdnia Wola 02.
340 meters from The Bridge is the Rondo Daszyńskiego metro station.

City bus

Muzeum Powstania Warszawskiego 02

70 m1 min

Muzeum Powstania Warszawskiego 06

90 m2 min

Muzeum Powstania Warszawskiego 05

130 m2 min
Subway

Rondo Daszyńskiego

340 m5 min
Quick request

We usually answer in 4 hours. We do not send spam.

Information on personal data security policy on officelist.pl. More »

Why get in touch with our consultants?
Katarzyna Stalmach
Jakub Sarzyński
Adriana Binkiewicz
Filip Kościkiewicz
  • we make sure the process goes quick and smooth
  • we know the market inside out
  • we will guide through lease negotiations
  • we will schedule all viewings and meetings for you
  • fit-out, construction costs and all technical details - yes, we know about that, too
TFI Skarbiec
New Balance
Shoplo
Hard Rock Cafe
Grand Parade (part of William Hill)

The Bridge's similar locations

See all offices in Warsaw Wola
Fabryka Norblina / ARTN - Art Norblin - Biura serwisowane, Żelazna 51/53, Warsaw, Wola

Office Fabryka Norblina / ARTN - Art Norblin - Biura serwisowane

Żelazna 51/53
Wola, Warsaw

Available offices0
RentContact us
Rent space100–200
Show now
Skyliner, Prosta 67, Warsaw, Wola

Office Skyliner

Prosta 67
Wola, Warsaw

Available offices0
Rent26 /
Rent space1,522
Show now
Warsaw Trade Tower / WTT, Chłodna 51, Warsaw, Wola

Office Warsaw Trade Tower / WTT

Chłodna 51
Wola, Warsaw

Available offices15
Rent15–21 €/㎡
Rent space106–10,862
Show now
The Warsaw Hub B, Rondo Daszyńskiego 2b, Warsaw, Wola

Office The Warsaw Hub B

Rondo Daszyńskiego 2b
Wola, Warsaw

Available offices3
Rent20 /
Rent space515–2,115
Show now

Market information about The Bridge

The design of Warsaw's skyscraper The Bridge has been unveiled

The Bridge skyscraper will be built in Warsaw at the end of 2024. The Ghelamco company has already outlined the design of the office building and preparations for the development are underway. The ...

Warsaw office building The Bridge with first awards

A modern office building, The Bridge, is under construction in Warsaw. The building has already won its first prize in the European Property Awards 2021-2022 competition. The Bridge is a modern off...

The Bridge skyscraper first in this part of Europe with SmartScore and WiredScore certifications

Two exceptional awards for The Bridge skyscraper under construction in Warsaw. The office building was the first in Central and Eastern Europe to receive SmartScore and WiredScore certifications. In b...