Construction has begun on the first part of the newly constructed Central Point office building in Warsaw. It will last nine months, as the work will be carried out at a level as high as 13.5 meters underground. The modern building will be located at the intersection of Marszałkowska and Świętokrzyska Streets, and since there is a station connecting two subway lines, the developers want to integrate it into the building. Central Point will offer 18,000 square meters of space, with future tenants able to customize between 900 and 990 meters of office space. Academics from Krakow University of Technology, Warsaw University of Technology, ITB and engineering studios BWL and Metroprojekt are involved in the project. The architectural design was done by the Kazimierski and Ryba Design Office and the Paris office of Arquitectonica. The building will be ready for lease by the end of the second quarter of 2020.